Change Language
Call Us

Process Controllers & Instruments

We are highly engaged in providing a wide range of Process Controllers & Instruments that focus on employing hardware and software to measure and control process variables in an industrial context. Mathematical models of industrial processes and systems are used to create control systems. They give the operator numerous indicators for regulating the process. Process Controllers & Instruments are available in huge varieties such as Co2 Controller, Industrial Sensors Controllers, Mold Temperature Controller, Analog Temperature Controller, Temperature Controllers, and many more. They act as an extension of a person's manual capabilities, allowing them to determine the value of an unknown quantity that they would otherwise be unable to measure.
Product Image (Data_Acquisition )

Data Acquisition Systems

Price: 50000 INR
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Month
  • Usage:Industrial
  • Weight:370 Grams (g)
  • Voltage:9-28 Volt (v)
Product Image (Humidity_Controller)

Humidity Controller

Price: 3000 INR
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Week
  • Material:Metal
  • Usage:Dehumidifiers
Product Image (Signal_Converter)

2-Channel Isolated Universal Signal Converter

Price: 4500 INR
  • Material:Metal
  • Usage:Industrial
  • Voltage:10-24 Volt (v)
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Week
Product Image (DATA LOGGER)

DC Voltage Data Loggers

Price: 5000 INR
  • Material:Metal
  • Usage:Industrial
  • Warranty:1 Year
  • Power:12 Volt (v)
  • Supply Ability:50 Per Month
  • Delivery Time:2-6 Week
Product Image (Industrial_Sensors )

Industrial Sensors Controllers

Price: 2000 INR
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Month
  • Voltage:24 Volt (v)
  • Usage:Industrial
Product Image (Autonics_Controller)

Autonics Temperature Controller PID Controller

Price: 2750 INR
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Week
  • Power:220 Volt (v)
  • Usage:Temperature Control
  • Material:Metal
Product Image (Vertex PID Control)

Vertex PID Controllers - VT4826

Price: 3000 INR
  • Material:Metal
  • Voltage:220 Volt (v)
  • Usage:Industrial
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Week
Product Image (Sequence_Controller)

Sequence Controller

Price: 5000 INR
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Month
  • Voltage:12 Volt (v)
  • Usage:Industrial
  • Power:3 Watt (w)
Product Image (Temperature_Control)

Yudian AI-508 509

Price: 3000 INR/Unit
  • Supply Ability:50 Per Month
  • Material:Metal
  • Usage:Industrial
  • Power:100-240 Volt (v)
Product Image (Programmable_Temp)

Programmable Temperature Controller

Price: 3000 INR
  • Material:Metal
  • Usage:Industrial
  • Power:100-240 Volt (v)
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Month
Product Image (PID Controllers)

PID Controllers

Price: 2500 INR
  • Usage:Industrial
  • Material:Metal
  • Supply Ability:50 Per Month
  • Delivery Time:2-6 Week
Product Image (Temperature Control )

Temperature Control Instruments

Price: 2000 INR
  • Usage:Industrial
  • Material:Metal
  • Supply Ability:50 Per Month
  • Delivery Time:2-6 Week
Product Image (Signal_Transmitter)

Programmable Isolated Signal Transmitter

Price: 3000 INR/Unit
  • Material:Metal
  • Voltage:10-20 Volt (v)
  • Usage:Industrial
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Week
Product Image (Temperature Control)

Temperature Controller

Price: 3000 INR/Unit
  • Delivery Time:1 Week
  • Supply Ability:550 Per Week
  • Power:100-240 Volt (v)
  • Warranty:1YEAR
  • Usage:Industrial
  • Material:Metal
Product Image (Data_Logger)

Data Logger

Price: 10000 INR
  • Color:Black
  • Material:Metal
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Week
Product Image (Automation_System )

Automation System Integrators

Price: 15000 INR/Unit
  • Delivery Time:2-6 Week
  • Supply Ability:50 Per Month
  • Voltage:380 Volt (v)
  • Usage:Industrial
Product Image (PLC-PROG)

PLC Programming

Price: 3500 INR/Unit
  • Supply Ability:50 Per Month
  • Delivery Time:2-6 Week
X